(f) the need for and position of signallers. (d) maximum crane travel speed, if applicable (3) The lift plan required in subsection (2) must include the following: (2) A written lift plan must be prepared for every tandem lift and must be available at the worksite during the lift. (b) is responsible for the safe conduct of the operation. (a) is not operating a crane, hoist or other piece of powered lifting equipment, and (1) If a tandem lift is a critical lift or if the lifted load is to be moved laterally, the tandem lift must be carried out under the direction of a qualified supervisor who Not be relied upon for accuracy in critical lifts such as tandem lifts.Ī load moment indicator (LMI) gives an accurate angle as well as loading Boom angle indicators are required on all mobile cranes, but they must